AQUACIAT serie LD - LDC - LDH - ILD - ILDH
Location :
The instructions given in the Installation, Operation, Commissioning and Maintenance manual must be respected.
The
AQUACIAT
units must be positioned outside a plant room, sheltered from adverse weather and frost, in conformity with
the regulations existing in the country of installation.
Piping must be protected from frost
- Leave a free space all around the unit to allow access to the control panel and technical compartments and to ensure a
correct air flow.
- Possible harmful effects due to noise are to be carefully studied.
Therefore, before positioning, study and treat the various possible noise transmissions ;
The assistance of an accoustic
specialist may be usefull.
- The unit must be levelled on resilient mounts.
- If required, fit the pipework with rubber expansion joints (optional)
Operations to be carried out before lifting the unit :
Follow the recommendations affixed on the machine or the instructions in the Installation, Operation, Commissioning and
Maintenance manual.
. Mounting of the accessories delivered separately :
The instructions in the Installation, Operation, Commissioning and Maintenance manual must be respected.
Several accessories, delivered separately
, can be mounted on the unit on site.
Electrical wiring :
The instructions in the Installation, Operation, Commissioning and Maintenance manual must be respected.
- All necessary instructions for electrical connections are detailed on the wiring diagrams enclosed with the unit.
They must
be strictly followed.
- These connections must be made in accordance with good engineering practice and must conform to regulations in force.
.
Main three phase electric power supply
.
Earth connection
.
Single phase electrical supply to the control box (depending on the models)
.
Remote control of the machine or volt free contact signals (optional)
- It is important to note that the chiller has no lightning protection
- Therefore, adequate protective devices against these transient phenomena must be planned and integrated on the electrical
supply on site.
- The machine must always be live to ensure the internal frost protection
Piping connections :
The instructions in the Installation, Operation, Commissioning and Maintenance manual must be respected.
All pipes must be correctly aligned and sloped toward the drain valve to permit complete drainage of the system.
Pipes must
be installed and connected to the machine, making sure that there is a free access to the panels….
Thermal insulation must
be provided.
- Pipes supports and fixations must be independant to avoid vibration and strains on the unit
- On-site connections required (evaporator, discharge and draining)
- Provide the accessories necessary for all hydraulic circuits, for example :
water expansion vessel,
drain valves on lower points of pipes for water drainage
circuit isolating valves and filters
air vents on upper points of pipes
check that there is a sufficient water volume in the installation (if necessary, provide a storage tank)
manual valve to adjust the water flow
thermometers at each inlet and outlet connection for measurement necessary during commissioning and
maintenance operations